• Mon - Fri : 8.00 - 17.00
  • Saturday & Sunday : Closed

Silo Services

Once you have decided to place an order for a Remix dry silo mortar system, we will need to know the mix required, total tonnage...

3 Phase Electrical Supply (Mains or Generator) 415 volt A 32amp 5 pin female socket (industrial), rated IP44, must be provided from a 32amp 3 ...

A ¾" water hose connected to a standard tap with a ¾" external thread must be provided within 5 metres of the silo...

Once Remix have received confirmation that safe access, a silo base and appropriate power and water provisions...

Ensure power leads and water hoses are correctly and securely connected...

All refill orders must be placed directly with the Remix order office. Please allow a minimum of 48-hours’ notice...

Removal of the Silo from Site To enable the silo to be removed from site quickly and to prevent any unwanted delays with the silo ...

Please contact us for support and information.